General
|
50,293 square feet, two story
concrete tilt-up. |
Entry Access
|
Lobby entry unlocked during
normal business hours, card key access after hours. All
entrances are equipped with a state-of-the-art security
system that is activated inside the building. |
Elevator
|
One Dover Hydraulic Elevator;
3,500 pound capacity; Elevator is located to the right
of steps in lobby area. |
Glazing
|
Solar gray glass 9/16” laminated
for sound control. Exterior windows will be cleaned 2 times
per year, interior windows 1 time per year.
|
HVAC
|
One zone system per 1,000
square feet or as required by Tenant.
|
Insulation
|
Building exterior fully insulated. |
Fire Sprinklers
|
Sprinkler system, smoke ventilation
system and fire quarantine systems are used throughout
the building. |
Locker Rooms
|
Locker rooms are located
within the men’s and women’s
restrooms on the first floor. Each locker room has 1 handicap
and 1 standard size shower and 12 individual lockers. |
Tenant Improvements
|
Bathrooms, office heating,
ventilation and air-conditioning system, skylights, additional
insulation, electrical and telephone distribution and controls,
reconfiguration of fire sprinklers, additional electric
power, front entry doors, and other interior build-out
and finishes not presently in the shell shall be added
as tenant improvements subject to negotiations between
Landlord and Tenant. Tenant improvement design consultation
and working drawings shall
be part of the tenant improvement package. |